Turrachbach power plant, Austria

Thanks to sustainable and economical approaches, the Fürstlich Schwarzenberg’isch Familienstiftung Schwarzenberg (Princely Schwarzenberg Family Foundation) should ensure power plant operation at the site for decades to come. It is planned that the Styrian district of Murau will be completely energy self-sufficient by 2015. Around 5.4 GWh are generated using a synchronous generator from AEM Dessau, which is driven by a cross-flow turbine.

Technical data

Type SE 630 M6
Number of units1
Machine typegenerator / synchronous
Degree of protection IP 44
Cooling systemIC 81W
Rated speed [rpm] 1.000
Rated power [kVA] 2.029
Rated voltage [V] 690
Rated frequency [Hz] 50
Shaft height [mm] 630
MountingIM B3