At Eggenbach power plant, it became necessary to buy new machines after just two years due to problems and slow performance. The decision was made to opt for a Pelton turbine and a machine unit from AEM. This allowed performance to be doubled to between 2.5 and 3 GWh per year.
Type | SE 500 M10 |
---|---|
Number of units | 1 |
Machine type | generator / synchronous |
Degree of protection | IP 21 |
Cooling system | IC 01 |
Rated speed [rpm] | 600 |
Rated power [kVA] | 600 |
Rated voltage [V] | 400 |
Rated frequency [Hz] | 50 |
Shaft height [mm] | 500 |
Mounting | IM B3 |